Wednesday, October 15, 2008

Playing a Little Catch Up

Here the Minimalist sits. For over a month! The plan was to put it together before Rhinebeck but that isn't going to happen. Putting it together, I mean. I WILL be at Rhinebeck!



The torquing easily blocked out.



I was going to take a picture of all three drying racks stacked up but then this little guy crushed the tower! Guess he thought it was set up just for him!

No weaving on the loom but I've started a new sweater - The Refined Aran.



I love the waist shaping and the baby cables.

ETA: Thanks, Marie, I corrected The Refined Aran link!

2 comments:

  1. Biological Psychology? That is no refined aran! You must be sleepy, Char.
    My sweater won't be ready either...it is a sleeveless sweater right now and the weather will be too cold to go sleevelss. Not to mention it would would look dumb.

    ReplyDelete
  2. Is that hem flip on the aran? The paired baby cables between expanses of stockinette really is a nice design. hmmm.

    ReplyDelete